September 21, 2026
A Public Open House meeting for this project will be held in the Lake Itasca Room, Ramsey Municipal Center, 7550 Sunwood Drive NW, from 4:30 to 6:30 p.m.
This project proposes milling and overlaying numerous MSA street segments within the south half of the COR, totaling 1.61 miles.
- Rhinestone Street bituminous pavement between Veterans Drive and Bunker Lake Boulevard
- Sunwood Drive bituminous pavement between Armstrong Boulevard and Ramsey Boulevard
- Veterans Drive between Zeolite Street and Rhinestone Street
- Zeolite Street between Sunwood Drive and Veterans Drive
All street segments in this project are urban sections and include concrete curb and gutter, municipal sewer and water, and storm sewer. The streets must meet MSA 10-ton pavement design standards and be marked to meet MSA lane width standards as well. Staff will evaluate whether pavement markings must be modified to meet current standards, including the various turn lanes along Sunwood Drive that have been modified several times due to past and current development.
In general, the improvements include a 2-inch mill and overlay, with spot curb replacements and ADA pedestrian ramp replacements.
The Capital Improvement Project level project costs are $785,169 ($747,780 MSA Funds, $37,389 Storm Water Utility Funds).