IP 27-05 Sorteberg’s 6th & Windsorwood

September 21, 2026

This project proposes to reconstruct the streets within the Sorteberg’s 6th and Windsorwood subdivisions. Sorteberg’s 6th, generally located along Rabbit Street and Puma Street between 173rd Avenue and 174th Avenue, is a 30-foot-wide urban section street with bituminous curbing and is 0.62 miles long. Drainage is handled along the bituminous curbing to curb cuts, which carry stormwater runoff to an existing low area in the center of the plat. Windsorwood, generally located along 178th Avenue between Baugh Street and Vicuna Street, is a 24-foot-wide urban section street, totaling 0.62 miles in length. These subdivisions were combined due to their proximity and size. Though Deerwood is relatively close to these subdivisions, it was kept separate to avoid making the project too large and complex.

At this time, no stormwater or soil correction improvements are anticipated for these subdivisions, though Sorteberg’s 6th will require an in-depth drainage review. Sorteberg’s 6th will require a full reconstruction, including replacing the bituminous curbing with concrete curb and gutter. The drainage review will determine whether catch basin inlets are appropriate replacements for the existing curb cuts and drainage swales. Windsorwood is proposed to be reconstructed using the FDR method, though this will be further explored during project design and review of the geotechnical report.

Municipal utilities do not exist in these subdivisions, which are outside of the 2040 MUSA.

Capital Improvement Project-level project costs are $1,329,009 ($1,155,660 Pavement Management Funds, $173,349 Stormwater Utility Funds).

-

-

Contact Us

City of Ramsey
7550 Sunwood Drive NW
Ramsey, MN 55303
Phone: 763-427-1410
Fax: 763-427-5543

Sign up to our Newsletter

Stay up to date on the city's activities, events, programs and operations by subscribing to our eNewsletters.